Hydropower plant "Kalimanci" | |
Length | 344 m |
Diameter | 5.0 m |
Construction time | 1963-1965 |
Hydropower plant "Gazivode | |
Length | 660 m |
Diameter | 5.0 m |
Construction time | 1970-1973 |
Hydropower plant "Mratinje" | |
Length | 426 |
Diameter | 10,7 m |
Construction time | 1969-1973 |
Diversion tunnel | |
Length | 330 m |
Diameter | 8,5 m |
Construction time | 1969-1973 |
Three inclined shafts | |
Length | 3x86 m |
Diameter | 5.8x3.9 m |
Construction time | 1969-1973 |
Uskočka 8, Belgrade, phone: 011/2181-888, fax:011/2620-548
All rights reserved © 2016 Hidrotehnika-Hidroenergetika a.d.