"Wadi Derna" Dam | |
Length | 1.000 m |
Diameter | 2,0 m |
Construction time | 1974-1976 |
"Keddara" Dam | |
Length | 3.100 m |
Diameter | 3,0 m |
Construction time | 1982-1986 |
Diversion tunnel | |
Length | 1.350 |
Diameter | 4,6 m |
Construction time | 1982-1986 |
Tunnel Borska-Kriveljska reka | |
Length | 2.321 m |
Diameter | 2,6 m |
Construction time | 1962-1965 |
Tunnel "Bileća" | |
Length | 4.200 m |
Diameter | 8,0 m |
Construction time | 1986-1988 |
Uskočka 8, Belgrade, phone: 011/2181-888, fax:011/2620-548
All rights reserved © 2016 Hidrotehnika-Hidroenergetika a.d.