Tunnel "Beli Potok" | |
Length | 850 m |
Diameter | 3,0 m |
Construction time | 1991-1994 |
Tunnel T1-T2 Beograd | |
Length | 688 m |
Diameter | 2,5 m |
Under construction | 1995 |
Project "Radojna-Bistrica" | |
Length | 8.026 m |
Diameter | 4,8/5,10 m |
Construction time | 1956-1959 |
"Barje" Dam | |
Length | 312 m + 198 m + 447 m |
Diameter | 4,7 m / 9,0 m / 3,1 m |
Construction time | 1984-1987 |
Uskočka 8, Belgrade, phone: 011/2181-888, fax:011/2620-548
All rights reserved © 2016 Hidrotehnika-Hidroenergetika a.d.