Industrial water supply for factory "Viskoza" - Loznica | |
Pipeline length | 4.500 m |
Pipeline diameter | 2x800 mm |
Water tank volume | 2x8.500 m3 |
Pump station capacity | 3.2 m3/h |
Year of completion | 1957 |
Employer | Factory "Viskoza" Loznica |
Drinking water supply for factory "Viskoza" - Loznica | |
Pipeline length | 5.500 m |
Pipeline diameter | 100-250 mm |
Well capacity | 50 l/sec |
Water tank capacity | 500 m3 |
Year of completion | 1957 |
Employer | Factory "Viskoza" Loznica |
Outside sewage disposal for "Viskoza" Loznica factory | |
Rain water conduit length | 3.500 m |
Rain conduit cross-section | 120/90 cm |
Length of sewers | 8.400 m |
Cross-section of sewers | 120/90 do 160/120 cm |
Waste pump stations | 3 |
Waste treatment plant | 1 |
Construction time | 1956 - 1958 |
Employer | Factory "Viskoza" Loznica |
Municipal water supply in Skopje, Macedonia | |
Pipeline length | 13.500 m |
Pipe diameter | 100-200 mm |
Construction time | 1963-1964 |
Employer | City council of Skopje |
Uskočka 8, Belgrade, phone: 011/2181-888, fax:011/2620-548
All rights reserved © 2016 Hidrotehnika-Hidroenergetika a.d.