Water supply and sewerage

Water supply and sewerage

Industrial water supply for factory "Viskoza" - Loznica 

Pipeline length 

4.500 m 

Pipeline diameter 

2x800 mm 

Water tank volume 

2x8.500 m3 

Pump station capacity 

3.2 m3/h 

Year of completion 

1957

Employer

Factory "Viskoza" Loznica

Drinking water supply for factory "Viskoza" - Loznica

Pipeline length

5.500 m

Pipeline diameter

100-250 mm

Well capacity

50 l/sec

Water tank capacity

500 m3

Year of completion

1957

Employer

Factory "Viskoza" Loznica

Outside sewage disposal for  "Viskoza" Loznica factory

Rain water conduit length

3.500 m

Rain conduit cross-section

120/90 cm

Length of sewers

8.400 m

Cross-section of sewers

120/90 do 160/120 cm

Waste pump stations

3

Waste treatment plant

1

Construction time

1956 - 1958

Employer

Factory "Viskoza" Loznica

Municipal water supply in Skopje, Macedonia

Pipeline length

13.500 m

Pipe diameter

100-200 mm

Construction time

1963-1964

Employer

City council of Skopje


Municipal water supply in Skopje, Macedonia

Sewer length

13.450 m

Pipe diameter

200-400 mm

Construction time

1963-1964

Employer

City council of Skopje

Sewage system in Beograd

Sewer length

2.500 m

Pipe diameter

100-110 mm

Year of completion

1965

Employer

Municipal water supply ,Beograd

Water supply in  Beograd

Pipeline length

4.000 m

Pipe diameter

600 mm

Year of completion

1963

Employer

Municipal water supply ,Beograd

Water tank "Bežanija II" u Zemunu

Water tank capacity

7.500 m2

Year of completion

1967

Employer

Municipal water supply ,Beograd


Pressure pipeline Železnik -water tank "Lipovica" ,Beograd

Pipeline length

8.230 m

Pipe diameter

500-700 mm

Construction time

1979-1981

Employer

Municipal water supply ,Beograd

Treatment basin "Bele Vode", Beograd

Basin dimensions

42x24x4.2 m

Excavation

7,350 m3

Backfill

3.300 m3

Concrete

1.500 m3

Construction time

1981-1982

Employer

Municipal water supply ,Beograd

Water supply and pump station "Slanci"
Pump station, primery pipeline and reservoir

Construction time

1990-1991

Employer

HE "Djerdap"

Water supply network of settlements Cerak Vinogradi,Železnik,Slanci,Lipovica

Length

25.000 m

Pipe diameter

250,400,700 mm

Construction time

1982/1984/1991

Employer

Municipal water supply ,Beograd