Reversible pumping plant "Bajina Bašta" is second stage of hydropower system "Bajina Bašta". Two embankment dams were constructed on mountain Tara, to form storage reservoir of 150 million m3. The third dam "Kruščica" is intended to supply with water villages and weekend cottages on Tara mountin.
![]() | ![]() |
![]() | ![]() |
Location | Drina, Bajina Bašta, Yugoslavia |
Type of dam | Embankment dam with clay fill |
Employer | HE Bajina Bašta |
Consultant | Energoprojekt - Beograd - Yugoslavia |
Dam: Lazići u koritu | |
Dam height | 125 m |
Embankment | 2.000.000 m3 |
Dam: Lazići na prevoju | |
Dam height | 45 m |
Embankment | 1.500.000 m3 |
Dam: Kruščica | |
Dam height | 39 m |
Embankment | 135.000 m3 |
Total: | |
Concrete | 170.000 m3 |
Tunnel length | 8.000 m |
Tunnel diameter | 6,30 m |
Storage capacity | 150.000.000 m3 |
Pumping height | 612 m |
Installed power | 2x300 MW |
Uskočka 8, Belgrade, phone: 011/2181-888, fax:011/2620-548
All rights reserved © 2016 Hidrotehnika-Hidroenergetika a.d.